国产一区二区欧美丝袜|天天射综合|色约约精品免费看视频,亚洲欧洲日产国码无码AV喷潮,一级特黄性色视频大片免费看 ,91精品国产综合欠

              Current location:HOME > PRODUCTS > coke guide >
              Product Name:

              Coke oven blocking car

              Product Description:

              Technical Operating Procedures for Coke Oven Barrier Car:

              Product details:
              Coke oven blocking car

              Technical Operating Procedures for Coke Oven Barrier Car:

              1.Be familiar with the hazards of this position,promptly identify and identify potential hazards in production,and keep relevant records.

              2 The direct section chief shall follow the work instructions and orders of the section chief and complete the assigned work tasks.

              3.Carefully implement the technical operation procedures for this position.

              According to the coke pushing plan of this shift,remove and adjust the furnace door,replace the furnace door,clean the furnace door and frame,and eliminate the phenomenon of smoke and fire from the furnace door.

              After removing the door according to the coke pushing plan of this shift,align the coke guide groove with the furnace number,turn on the signal light,and use a walkie talkie to notify the coke quenching truck driver and the coke pushing truck driver to smoothly guide the coke into the coke quenching truck.

              Familiar with the equipment performance,structure,and operating principle of the coke blocking car,and master the 5-2 coke pushing sequence.

              7.Maintain and maintain various coke oven equipment of the coke blocking truck.

              8.Keep the coke blocking car body clean.

              9.Assist in the work of iron parts,hot repairs,and furnace door groups.

              Carefully carry out the handover work.

              11.Cooperate with maintenance to check if the shaft pin screws are loose.



            1. prev:none
            2. next:Coke blocking car for coke oven
            3. NEWS
            4. Production process and control of furnace tube temp
              Production process and control of furnace tube temp

              Ordinary coking enterprises all have the problem of high energy consumption and heavy pollution.At th...

            5. Coking equipment accessories - Cold coke discharge
              Coking equipment accessories - Cold coke discharge

              The cold coke discharge device is installed at the bottom of the dry quenching tank to discharge the ...

            6. How to solve and preventive measures for faults in
              How to solve and preventive measures for faults in

              Half of the air pollution on the top of coking equipment accessories is caused by the escape of raw g...